1609, Imagine Tech Park, 16th Floor, Block-DP, Sector-V, Salt Lake City, Kolkata – 700091, India
Aeonic Engineering & Company Pvt. Ltd.
Request a Consultation
+91 97483 70705 aec@aeonicgroup.com
Overpass at Sarora Chowk, Ring Road No. 2, Raipur
Bridges & Structures Completed Chhattisgarh

Overpass at Sarora Chowk, Ring Road No. 2, Raipur

ClientOFFICE OF THE CHIEF ENGINEER P.W.D BRIDGE CONSTRUCTION ZONE RAIPUR
Job Year2025
LocationChhattisgarh

Project Overview

Construction of overpass on ring road no. 2 at sarorachowk near reliance petrol pump, raipur

Project Details

  • Project Authority: OFFICE OF THE CHIEF ENGINEER P.W.D BRIDGE CONSTRUCTION ZONE RAIPUR
  • EPC Contractor: G S EXPRESS PVT LTD (Anand Group) Lucknow (UP)
  • Type of Job: New overpass on ring road
  • Road Length: 772 m
  • Carriageway: 4-Lane with Service Road
  • Pavement: Flexible pavement

Structures

  • VOP: Length- 111.84m Span- 3x37.28m

Scope of Work

  • Physical Site Visit & Ground Reality Assessment
  • Study of RFP, Concession Agreement, Schedules B, C, D, H
  • Study of Tender Drawings vs Site Requirement
  • Original Ground Level (OGL) Survey, Centre Line Transfer
  • ROW Demarcation, Utility Shifting Survey, Tree Counting
  • Longitudinal Section & Cross Section Survey
  • Contour Survey, DTM Generation
  • Detailed Highway Design in Civil 3D / OpenRoads
  • Geometric Design – Plan, Profile, Cross Section (10m Interval)
  • TCS Drawings, Junction Design, Service Road Design
  • Flexible & Rigid Pavement Design (IRC:37, IRC:58)
  • Structural Design of All Structures:
  • Hume Pipe Culvert, Box / Slab Culvert, Minor Bridge, Major Bridge, VUP, LVUP, SVUP, PUP, ROB, RUB, Flyover, Viaduct
  • Foundation Design – Open, Pile, Well Foundation
  • RE Wall Design, Retaining Wall, Breast Wall, Toe Wall
  • Slope Protection Works – Cost Comparison (Geotextile vs Boulder vs PCC)
  • Drain Design – Longitudinal Drain, Median Drain, Outfall
  • Preparation of GFC Drawings with BBS, BOQ, Construction Sequence, Shuttering Scheme
  • Proof Checking & IE/AE Approval Coordination
  • Value Engineering – Reducing Steel / Concrete / Height to Save Cost & Time
  • Change of Scope (COS) Proposal: Identification of COS Events as per CA Clause 16, Preparation of Detailed Design, Drawings, Estimate as per SOR, Rate Analysis for NS Items with 3 Quotations, Justification Note, Submission to IE/AE
  • CA Cost / Additional Cost: Due to Change in Law, Change in Design, Extra Lead, Delay due to ROW / Utility
  • Variation Statement, Extra Item Statement
  • Road Marking & Signage Plan: Plan as per IRC:35, IRC:67, Placement Drawing, Quantity
  • Junction Improvement Plan: Layout Plan, Turning Radius, Channelizer Island, Stop Line, Signal Location
  • Road Safety Report / Audit: As per IRC:SP:88, Black Spot Analysis, Safety Measures, Crash Barrier Warrant, Speed Breaker, Rumble Strip Details
  • Preparation of AsBuilt Drawings for Highway – Plan, Profile, Cross Section with Final Levels
  • AsBuilt for All Structures – Foundation, Substructure, Superstructure with Actual Levels
  • AsBuilt for Junction, Drain, RE Wall, Protection Works

Project Gallery

Location

View on Google Maps