4-Lane Elevated Flyover at Bihat Chandni Chowk, NH-31
Bridges & Structures Completed Bihar

4-Lane Elevated Flyover at Bihat Chandni Chowk, NH-31

ClientNATIONAL HIGHWAYS AUTHORITY OF INDIA
Job Year2025
LocationBihar

Project Overview

Construction of Four lane Elevated Flyover at Bihat Chandni chowk from Km. 209.450 to Km. 210.350 (Total Length= 900m) of NH31 for permanent rectification of MORTH Identified Blackspot over Simaria-Khagaria Section of NH-31 from Km.206.050 to 266.282 (Design Chainage) of NH-31) in the state of Bihar on EPC mode.

Project Details

  • Project Authority: NATIONAL HIGHWAYS AUTHORITY OF INDIA
  • EPC Contractor: HARI CONSTRUCTION & ASSOCIATES PVT. LTD.
  • Type of Job: Four lane Elevated Flyover
  • Road Length: 1.225 km
  • Carriageway: Four lane Elevated Flyover
  • Pavement: Flexible pavement

Structures

  • Load Bearing RCC Drain: 400 m
  • Flyover: 1 No Span- 18x30m

Scope of Work

  • Physical Site Visit & Ground Reality Assessment
  • Study of RFP, Concession Agreement, Schedules B, C, D, H
  • Study of Tender Drawings vs Site Requirement
  • Original Ground Level (OGL) Survey, Centre Line Transfer
  • ROW Demarcation, Utility Shifting Survey, Tree Counting
  • Longitudinal Section & Cross Section Survey
  • Contour Survey, DTM Generation
  • Detailed Highway Design in Civil 3D / OpenRoads
  • Geometric Design – Plan, Profile, Cross Section (10m Interval)
  • TCS Drawings, Junction Design, Service Road Design
  • Flexible & Rigid Pavement Design (IRC:37, IRC:58)
  • Structural Design of All Structures:
  • Hume Pipe Culvert, Box / Slab Culvert, Minor Bridge, Major Bridge, VUP, LVUP, SVUP, PUP, ROB, RUB, Flyover, Viaduct
  • Foundation Design – Open, Pile, Well Foundation
  • RE Wall Design, Retaining Wall, Breast Wall, Toe Wall
  • Slope Protection Works – Cost Comparison (Geotextile vs Boulder vs PCC)
  • Drain Design – Longitudinal Drain, Median Drain, Outfall
  • Preparation of GFC Drawings with BBS, BOQ, Construction Sequence, Shuttering Scheme
  • Proof Checking & IE/AE Approval Coordination
  • Value Engineering – Reducing Steel / Concrete / Height to Save Cost & Time
  • Change of Scope (COS) Proposal: Identification of COS Events as per CA Clause 16, Preparation of Detailed Design, Drawings, Estimate as per SOR, Rate Analysis for NS Items with 3 Quotations, Justification Note, Submission to IE/AE
  • CA Cost / Additional Cost: Due to Change in Law, Change in Design, Extra Lead, Delay due to ROW / Utility
  • Variation Statement, Extra Item Statement
  • Road Marking & Signage Plan: Plan as per IRC:35, IRC:67, Placement Drawing, Quantity
  • Junction Improvement Plan: Layout Plan, Turning Radius, Channelizer Island, Stop Line, Signal Location
  • Road Safety Report / Audit: As per IRC:SP:88, Black Spot Analysis, Safety Measures, Crash Barrier Warrant, Speed Breaker, Rumble Strip Details
  • Preparation of AsBuilt Drawings for Highway – Plan, Profile, Cross Section with Final Levels
  • AsBuilt for All Structures – Foundation, Substructure, Superstructure with Actual Levels
  • AsBuilt for Junction, Drain, RE Wall, Protection Works