High Level RCC Bridge over Mahananda River, Abhaipur Ghat
Bridges & Structures Completed Bihar

High Level RCC Bridge over Mahananda River, Abhaipur Ghat

ClientSenior Project Engineer, Bihar Rajya Pul Nirman Nigam Limited Works Division, Katihar
Job Year2024
LocationBihar

Project Overview

CONSTRUCTION OF H.L RCC BRIDGE 1113M, APPROACH ROAD 2029 MTR, GUIDE BUND AND PROTECTION WORK OVER MAHANANDA RIVER CONNECTING SH-99 (BAISA) TO NH-31 (KANKI) AT ABHAIPUR GHAT IN THE DISTRICT OF PURNEA ON ENGINEERING PROCUREMENT & CONSTRUCTION (EPC) MODE

Project Details

  • Project Authority: Senior Project Engineer, Bihar Rajya Pul Nirman Nigam Limited Works Division, Katihar
  • EPC Contractor: NARAINDAS CONSTRUCTION PVT. LTD.
  • Type of Job: EPC mode
  • Carriageway: 2-Lane with Flexible pavement
  • Pavement: Flexible pavement

Structures

  • No. of Culverts: 4 Nos.
  • Major Bridges: 1 Nos. Length- 1113 Mtr Length of span should be minimum 58.58 Mtr & Maximum 100 Mtr.

Scope of Work

  • Physical Site Visit & Ground Reality Assessment
  • Study of RFP, Concession Agreement, Schedules B, C, D, H
  • Study of Tender Drawings vs Site Requirement
  • Original Ground Level (OGL) Survey, Centre Line Transfer
  • ROW Demarcation, Utility Shifting Survey, Tree Counting
  • Longitudinal Section & Cross Section Survey
  • Contour Survey, DTM Generation
  • Detailed Highway Design in Civil 3D / OpenRoads
  • Geometric Design – Plan, Profile, Cross Section (10m Interval)
  • TCS Drawings, Junction Design, Service Road Design
  • Flexible & Rigid Pavement Design (IRC:37, IRC:58)
  • Structural Design of All Structures:
  • Hume Pipe Culvert, Box / Slab Culvert, Minor Bridge, Major Bridge, VUP, LVUP, SVUP, PUP, ROB, RUB, Flyover, Viaduct
  • Foundation Design – Open, Pile, Well Foundation
  • RE Wall Design, Retaining Wall, Breast Wall, Toe Wall
  • Slope Protection Works – Cost Comparison (Geotextile vs Boulder vs PCC)
  • Drain Design – Longitudinal Drain, Median Drain, Outfall
  • Preparation of GFC Drawings with BBS, BOQ, Construction Sequence, Shuttering Scheme
  • Proof Checking & IE/AE Approval Coordination
  • Value Engineering – Reducing Steel / Concrete / Height to Save Cost & Time
  • Change of Scope (COS) Proposal: Identification of COS Events as per CA Clause 16, Preparation of Detailed Design, Drawings, Estimate as per SOR, Rate Analysis for NS Items with 3 Quotations, Justification Note, Submission to IE/AE
  • CA Cost / Additional Cost: Due to Change in Law, Change in Design, Extra Lead, Delay due to ROW / Utility
  • Variation Statement, Extra Item Statement
  • Road Marking & Signage Plan: Plan as per IRC:35, IRC:67, Placement Drawing, Quantity
  • Junction Improvement Plan: Layout Plan, Turning Radius, Channelizer Island, Stop Line, Signal Location
  • Road Safety Report / Audit: As per IRC:SP:88, Black Spot Analysis, Safety Measures, Crash Barrier Warrant, Speed Breaker, Rumble Strip Details
  • Preparation of AsBuilt Drawings for Highway – Plan, Profile, Cross Section with Final Levels
  • AsBuilt for All Structures – Foundation, Substructure, Superstructure with Actual Levels
  • AsBuilt for Junction, Drain, RE Wall, Protection Works