1609, Imagine Tech Park, 16th Floor, Block-DP, Sector-V, Salt Lake City, Kolkata – 700091, India
Aeonic Engineering & Company Pvt. Ltd.
Request a Consultation
+91 97483 70705 aec@aeonicgroup.com
Pratapgarh Bypass (Extension), NH-31 to NH-330
Highways & Transportation Completed Uttar Pradesh

Pratapgarh Bypass (Extension), NH-31 to NH-330

ClientNH Division, Lucknow (UP) under MoRTH
Job Year2023
LocationUttar Pradesh

Project Overview

Construction of Pratapgarh Bypass (Extension) connecting NH31 to NH-330 on EPC mode in the state of Uttar Pradesh”.(Design Length6.125 Km)

Project Details

  • Project Authority: NH Division, Lucknow (UP) under MoRTH
  • EPC Contractor: GS Express Pvt. Ltd., Lucknow
  • Type of Job: EPC mode
  • Road Length: 6.125 km
  • Carriageway: 2-Lane with Flexible pavement
  • Pavement: Flexible pavement

Structures

  • No. of Culverts: Total 7 nos.
  • Minor Bridges: Total 02 nos. 1 no of [1 x 20m] Total width of 18m 1 no of [1 x 10m] Total width of 18m
  • LVUP: 1 Nos. Span- 1 x 12m
  • VUP: 2 Nos. Span- 2 x 10m
  • R.O.B.: 1 Nos. 18m (Viaduct)+60m (ROB)+18m (Viaduct)

Scope of Work

  • Proof Consultant (As per EPC contracts and Schedules)

Project Gallery

Location

View on Google Maps