Project Overview
Widening to Four Lane rigid pavement configuration from 90.00 to km 100.800 of NH-96 (Km 42.0 to 53.300 as per new NH-330),design length of 11.300 km under EPC mode in the State of Uttar Pradesh
Project Details
- Project Authority: NH Division, Lucknow (UP) under MoRTH
- EPC Contractor: GS Express Pvt. Ltd., Lucknow
- Type of Job: EPC mode
- Road Length: 11.3 km
- Carriageway: 4-Lane with rigid pavement
- Pavement: Rigid Pavement
Structures
- No. of Culverts: Total 5 nos.
- Minor Bridges: Total 01 nos. widening 2x5.5
- Major Bridge: Total 01 nos. Span: 4X32 m
- R.O.B.: Total 1 nos. (4x45+1x60+1x45)
Scope of Work
- Proof Consultant (As per EPC contracts and Schedules)